DOC 05-01
To: John.Bullock@dc.gov
Cc: muhammed.khalid@dc.gov, ken.laden@dc.gov,
anc3f@juno.com,
maudlin@alum.mit.edu, anc3f01@starpower.net,
danielklibanoff@hotmail.com, fwinstead@hotmail.com,
KarenPerry2@juno.com, mitalgandhi@gmail.com
Date: Thu, 7 Jul 2005 17:43:34 -0400
Subject: Road Projects in ANC 3F Scheduled
for FY 2006 through 2010
Dear John,
At its regularly scheduled monthly meeting
on June 20, 2005, ANC 3F voted
7-0-0, with a quorum present, to submit the
following comments on road
projects in ANC 3F scheduled for fiscal years
2006 through 2010, as well
as the comments on the attached list.
In conducting its review, ANC 3F found that
a number of streets slated
for repair have been repaired recently. These streets are indicated on
the attached list. It
is unlikely they need repair so soon. You should
consider dropping them from the list or rescheduling
them later in the
repair cycle.
Some streets needing repair are not on the
list, but should be. They
are:
Tilden Street between Beach Drive (Rock Creek
Park) and Connecticut
Avenue (Several cross streets are scheduled
for repair in FY 2006, 2007,
and 2008. Clark Construction
intends to apply to build a planned unit
development near Connecticut Avenue.)
Fort Drive between Grant Road and Albemarle
Street (Although Fort Drive
between Tenley Circle and Grant Road is part
of the Tenley Circle
contract and Fort Drive between Albemarle and
Chesapeake Streets is
scheduled for repair in FY 2005, this segment
between them appears to
have been forgotten. It
is in deplorable condition with 6" deep
potholes.)
37th Street between Van Ness and Veazey Streets
(37th Street between
Veazey and Warren Streets is scheduled for
repair in FY 2008. This block
just to the south is in equally poor condition.)
38th Street between Upton and Van Ness Streets
(38th Street between Van
Ness and Veazey Streets is scheduled for repair
in FY 2008. This block
just to the south is in equally poor condition.)
Reno Road between Warren Street and Windom
Place (Reno Road between
Windom Place and Yuma Street is scheduled for
repair in FY 2009. The
cracked pavement actually starts farther south,
near Warren Street.)
Some streets are in particularly poor condition
and should be repaired
sooner in the cycle:
Reno Road between Brandywine and Davenport
Streets (scheduled for FY 2009
- federal funds: cracked
and patched; the patches even have patches.
This needs immediate attention.)
Appleton Street between 36th Street and Reno
Road (scheduled for FY 2009
- local funds: the part
of Appleton near Reno Road is in very poor
condition and needs immediate attention.)
Reno Road between Tilden and Upton Streets
(scheduled for FY 2010 -
federal funds: This
is in as bad shape as Reno between Upton and Van
Ness, which is scheduled for repair in FY 2008.)
ANC 3F recommends that DDOT coordinate all
road projects with WASA to
make sure that its work does not get torn up
shortly after completion.
The WASA map indicates a large number of lead
service lines in ANC 3F.
We understand that WASA is giving first priority
to replacing service
lines for those most at risk, not necessarily
on a block by block basis.
Please work with WASA to make sure that lead
service lines have been
replaced before beginning construction.
Several of the projects are near schools and
construction projects. DDOT
should coordinate its work with the schools
and construction projects to
make sure everything goes smoothly.
Finally, two of the projects are in the Grant
Road Historic District.
Because the road is an integral part of the
district, we urge you to work
with residents and SHPO on the design of the
projects.
Thank you for this opportunity to review the
list of proposed projects
and to give comments.
Regards,
Cathy Wiss
Commissioner, ANC 3F06
202-966-1310
Attachment: Road Projects in ANC3F - FY2006 to
FY2010